(785) 543-2114 Sunday, September 5, 2010  
 
 
 
Gretna Bins(cont)
Gretna Bins (cont.) 
Gretna (cont)  06/17/09 3:06:57 PM

Construction continues at a rapid pace, here is the top 2 rings of the bin with the roof being installed.  The roof has interlocking sections.  Every 4 section will have  roffing vent on it.

Here is view of the interlocking sections being installed on the roof.

Close up view of the roofing vents.

 
Copyright DTN. All rights reserved. Disclaimer.
Powered By DTN