| New Bin Construction at West Annex Location |
West Annex, Sept. 22 01/20/10 3:04:39 PM
The outside of this structure is the tower that supports the solid leg on the inside. | | This is the distributer that goes at the top of the leg, the down spouts will be connected to the distributer to get the grain into the bins. |
| The siding is starting to go on the scale house. As soon as it is enclosed they will start to put on the dry wall. |
|