|
|
|
| New Bin Construction at West Annex Location |
West Annex, Oct. 14 01/20/10 3:07:07 PM
This is the incline dump auger and the finished West tank. The sweep augers have been installed at this time. | | The downspout of the incline receiving conveyer empties into the leg with a downspout. |
| The small concrete openings are support for the aeration in the floor. The large opening is the tunnel that holds the unload conveyer. |
|