(785) 543-2114 Tuesday, September 7, 2010  
 
 
 
New Bin Construction at West Annex Location
New West Annex Bins 
West Annex, Aug. 10  01/20/10 2:53:50 PM

Forming the wall on top of the footings on the East bin, and the poured footings of the West bin.

These are the forms for the areation tunnels.

This is the unload drag conveyer tunnel that brings grain from the bin back to the elevator leg for load outs.

 
Copyright DTN. All rights reserved. Disclaimer.
Powered By DTN