|
|
|
| New Bin Construction at West Annex Location |
West Annex, Aug. 10 01/20/10 2:53:50 PM
Forming the wall on top of the footings on the East bin, and the poured footings of the West bin. | | These are the forms for the areation tunnels. |
| This is the unload drag conveyer tunnel that brings grain from the bin back to the elevator leg for load outs. |
|