|
|
|
| New Bin Construction at West Annex Location |
West Annex, Aug. 10 08/11/09 3:28:16 PM
The small wooden boxes are where the grain gates will be located. | | Steel is being formed for the floor of the East bin. |
| Sand is being packed, getting ready to put up the forms to pour the side walls. |
|