| New Bin Construction at West Annex Location |
West Annex, Sept. 14th 01/20/10 3:00:33 PM
East bin is almost done, they have 4 rings left to put on. Each ring is 32" high, with 21 rings in all. From the eves to the floor the bins it is 56' high. | | This is the bottem of the tower and leg, that will go in between the 2 bins. |
| This is the forms for the concrete to be poured into for the drive over dump areas. |
|