New Bin Construction at West Annex Location
New West Annex Bins 
West Annex, Sept. 14th  01/20/10 3:00:33 PM

East bin is almost done, they have 4 rings left to put on.  Each ring is 32" high, with 21 rings in all.  From the eves to the floor the bins it is 56' high.

This is the bottem of the tower and leg, that will go in between the 2 bins.

This is the forms for the concrete to be poured into for the drive over dump areas.

 